Rigid Pc Films,Rigid Transparent Pc Films,Glossy Matte Pc Films,Rigid Thicken Intensification Pc Films Shandong Top Leader Plastic Packing CO., LTD , https://www.sdzlplastic.com
Aluminum Die Casting Auto Engine Part High Quality and Design Pattern
NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY was established in 2001. The company specializes in high-precision CNC machining and offers a wide range of manufacturing services, including pressure casting, sand casting, investment casting, and gravity casting. We work with various materials such as aluminum alloys (A380, A390, ADC12, YL102, A356), 6000 series aluminum extrusion, zinc alloy, iron, and copper. Our products are widely exported to countries like the USA, Europe (including England, Germany, Italy, Belgium), and Asia (such as Japan and Korea). We have successfully obtained the ISO/TS16949 quality management certification.
Here is a detailed overview of our capabilities:
- **Model No.:** 373
- **Machining Fixture:** Fixture Design and Fabrication
- **Software Applied:** PRO/E, Auto CAD, Solid Work 2013, UG
- **Trademark:** Customized
- **Transport Package:** Carton, Environmental Pallet
- **Specification:** Customized
- **Origin:** Ningbo
- **HS Code:** 7616991090
| **Material:** | ADC-12 |
|--------------|--------|
| **Cavity Number:** | 1 |
| **Process Technology:** | High Pressure Die Casting |
| **Product Dimensions:** | Customized |
| **Casting General Tolerance:** | Grade GB-CT4 |
| **Surface Finish:** | Polishing, Vibratory Deburring, Anodizing, Powder Coating, Painting, etc. |
| **Flow Processes:** | Die Casting, Degating, Polishing, Vibratory Deburring, Machining, CNC Machining by Machining Center, Cleaning, Powder Coating, Packing, Shipping |
| **Control Measures:** | Incoming Material Test, First Article Inspection, Routing Inspection, Final Item Inspection, and Outgoing Quality Control |
| **Inspection Equipment:** | CMM, Caliper, Plug Gage, Spectrograph, Pneumatic Measuring Tool, etc. |
| **Application:** | Machinery Parts |
| **Certificate:** | ISO/TS16949:2009 |
| **Lead Time:** | 30-35 days |
| **Trade Term:** | FOB Ningbo |
**FAQs:**
**Q1. When can I get the price?**
A: We usually provide a quotation within 2-3 days after receiving your RFQ. If there are any questions regarding the drawings, we will respond within 2 days.
**Q2. How long is the lead-time for mold?**
A: It depends on the size and complexity of the mold. Typically, it takes 35-45 days.
**Q3. I don't have a 3D drawing, how should I start a new project?**
A: You can send us a sample, and we will help create a 3D model accordingly.
**Q4. How do you ensure product quality before shipment?**
A: We follow a strict development process. During sample development, we can produce according to the PPA, and after PSW approval, we ensure full compliance with quality standards.
We are committed to delivering high-quality products and providing excellent customer service. Whether you need custom parts or standard components, we are here to support your manufacturing needs. Contact us today for more information or to discuss your next project.