Shandong Top Leader Plastic Packing CO., LTD , https://www.sdzlplastic.com
Aluminum Die Casting Auto Engine Part High Quality and Design Pattern
NINGBO ZHENHAI BOLANG METAL PRODUCT FACTORY was established in 2001. The company focuses on high-precision CNC machining and specializes in producing a wide range of components, including auto parts, agricultural parts, machinery parts, lighting parts, and hardware fittings. We offer various casting methods such as pressure casting, sand casting, investment casting, and gravity casting. Our materials include aluminum alloys like A380, A390, ADC12, YL102, A356, 6000 series aluminum extrusions, zinc alloy, iron, and copper. Our products are primarily exported to countries like the USA, Europe (England, Germany, Italy, Belgium), and Asia (Japan, Korea). We have successfully obtained the ISO/TS16949 quality management certification.
Here are some key details about our product:
- **Model No.:** 373
- **Machining Fixture:** Fixture Design and Fabrication
- **Software Applied:** PRO/E, Auto CAD, Solid Work 2013, Ug
- **Trademark:** Customized
- **Transport Package:** Carton, Environmental Pallet
- **Specification:** Customized
- **Origin:** Ningbo
- **HS Code:** 7616991090
**Product Specifications:**
| Item | Details |
|------|---------|
| Material | ADC-12 |
| Cavity Number | 1 |
| Process Technology | High Pressure Die Casting |
| Product Dimensions | Customized |
| Casting General Tolerance | GB-CT4 |
| Surface Finish | Polishing, Vibratory Deburring, Anodizing, Powder Coating, Painting, etc. |
| Flow Processes | Die Casting, Degating, Polishing, Vibratory Deburring, Machining, CNC Machining, Cleaning, Powder Coating, Packing, Shipping |
| Control Measures | Incoming Material Test, First Article Inspection, Routing Inspection, Final Item Inspection, and Outgoing Quality Control |
| Inspection Equipment | CMM, Caliper, Plug Gage, Spectrograph, Pneumatic Measuring Tool, etc. |
| Application | Machinery Parts |
| Certificate | ISO/TS16949:2009 |
| Lead Time | 30-35 days |
| Trade Term | FOB Ningbo |
**FAQs:**
**Q1. When can I get the price?**
A: We usually provide a quotation within 2-3 days after receiving your RFQ. If there are any questions regarding the drawings, we will respond within 2 days.
**Q2. How long is the lead-time for the mold?**
A: The lead time depends on the size and complexity of the mold. Normally, it takes 35-45 days.
**Q3. I don't have a 3D drawing. How should I start a new project?**
A: You can send us a sample, and we will help create a 3D model accordingly.
**Q4. How do you ensure product quality before shipment?**
A: We follow a strict development process. During sample development, we can produce according to PPA, and once PSW is approved, we proceed with mass production.
We are committed to delivering high-quality products and excellent customer service. If you have any further questions or need assistance, feel free to contact us.