Selection and use of electromagnetic pulse valve

<

1. Before installation, please pay attention to the conditions of the valve, such as working pressure range, power conditions (AC, DC, voltage size), function, diameter and other response checks and valve signage or user manual indicate the match. Ventilation and power-on test should be carried out on the test bench before installation to check whether the commutation performance is normal or not 3. The rust, dust and other dirt in the pipeline should be thoroughly cleaned before installation 4. The installation should pay attention to the cleanliness of the Ruijie electromagnetic pulse valve Install the position and indicate the direction of the air flow, must not be wrong .In the valve gas source port upstream must be installed split filter, pressure relief valve and oil mist lubricator to ensure that the supply valve has a certain pressure of dry, clean, lubricated Air to normal and reliable work 5. Debugging, first air pressure adjusted to 0.5-0.6MPa, manually adjust the valve moving parts normal, and then adjust the electric .. After commissioning, the system pressure is adjusted to the project requirements. Keyword search: Electromagnetic pulse valve

Hairdressing Items

Flat Iron Hair,Heat Styling Brush,Blow Dryer Brush,Hair Brush Blow Dryer

Shenzhen Unitepin Tech Co.Ltd , https://www.rifnylife.com